Parking Archives - ³ÉÈËÍ·Ìõ Construction /markets/parking/ Building Community Since 1907 Thu, 09 May 2024 16:25:24 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.3 /wp-content/uploads/2021/07/cropped-favicon-1-150x150.png Parking Archives - ³ÉÈËÍ·Ìõ Construction /markets/parking/ 32 32 The Lab Parking Structure /projects/the-lab-parking-structure/ Wed, 21 Jun 2023 22:20:30 +0000 /?post_type=projects&p=15574 ³ÉÈËÍ·Ìõ is providing a new design build cast-in-place parking structure for a new life science campus development in Berkeley, CA.  The 145,000 SF parking structure includes five-levels (one level below grade) and 405 stalls.

The post The Lab Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
³ÉÈËÍ·Ìõ is providing a new design build cast-in-place parking structure for a new life science campus development in Berkeley, CA.  The 145,000 SF parking structure includes five-levels (one level below grade) and 405 stalls.

The post The Lab Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Salinas Valley Health Parking Structure /projects/salinas-valley-health-parking-structure/ Tue, 20 Jun 2023 23:27:46 +0000 /?post_type=projects&p=15201 Salinas Valley Health has roots running back to 1953 when its hospital was first founded to service the Monterey County community.  To provide more parking at the campus, ³ÉÈËÍ·Ìõ is expanding the existing parking garage. The design build project includes four levels of parking above a basement level containing support spaces and loading dock. The […]

The post Salinas Valley Health Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Salinas Valley Health has roots running back to 1953 when its hospital was first founded to service the Monterey County community.  To provide more parking at the campus, ³ÉÈËÍ·Ìõ is expanding the existing parking garage. The design build project includes four levels of parking above a basement level containing support spaces and loading dock. The cast-in-place concrete extension to the existing parking structure includes 245 stalls within 76,251 SF.

The post Salinas Valley Health Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Excellence in Architecture Award /award/aia-san-francisco-chapter/ Mon, 22 Nov 2021 23:01:07 +0000 /?post_type=award&p=12613 The post Excellence in Architecture Award appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
The post Excellence in Architecture Award appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
University of California, San Francisco – Mission Bay Building 23B Parking Structure /projects/ucsf-mission-bay-building-23b-parking-structure/ Mon, 22 Nov 2021 22:53:49 +0000 /?post_type=projects&p=12614 Design and construction of a 256,276 SF pre-cast hybrid parking structure in Mission Bay, a very congested area of San Francisco. The facility includes 882 parking stalls on nine-levels with two elevators. The exterior features DNA bar-code style custom glass cladding. ³ÉÈËÍ·Ìõ self-performed the vertical poured-in place concrete and foundations. The project was awarded Excellence […]

The post University of California, San Francisco – Mission Bay Building 23B Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Design and construction of a 256,276 SF pre-cast hybrid parking structure in Mission Bay, a very congested area of San Francisco. The facility includes 882 parking stalls on nine-levels with two elevators. The exterior features DNA bar-code style custom glass cladding. ³ÉÈËÍ·Ìõ self-performed the vertical poured-in place concrete and foundations. The project was awarded Excellence in Architecture by American Institute of Architects.

 

The post University of California, San Francisco – Mission Bay Building 23B Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Kaiser Oakland Garage #1 /projects/kaiser-oakland-garage-1/ /projects/kaiser-oakland-garage-1/#respond Mon, 24 May 2021 11:06:53 +0000 http://overaa-construction.local/?projects=kaiser-oakland-garage-1 3″-6″ thick mat slab foundation for a six-level (two below grade), 531-stall parking structure that ³ÉÈËÍ·Ìõ built. We placed 5,339 CY of concrete for the foundation over a 24-hour period. This required 594 deliveries – one every 1.6 minutes with 66 mixer trucks. We self-performed the foundation and placing of all vertical concrete. Adjacent occupied […]

The post Kaiser Oakland Garage #1 appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
3″-6″ thick mat slab foundation for a six-level (two below grade), 531-stall parking structure that ³ÉÈËÍ·Ìõ built. We placed 5,339 CY of concrete for the foundation over a 24-hour period. This required 594 deliveries – one every 1.6 minutes with 66 mixer trucks. We self-performed the foundation and placing of all vertical concrete. Adjacent occupied buildings with a limited laydown area.

The post Kaiser Oakland Garage #1 appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
/projects/kaiser-oakland-garage-1/feed/ 0
Kaiser Vallejo Parking Structure /projects/kaiser-vallejo-parking-structure/ /projects/kaiser-vallejo-parking-structure/#respond Mon, 24 May 2021 11:06:53 +0000 http://overaa-construction.local/?projects=kaiser-vallejo-parking-structure Construction of a 241,750 SF parking structure with 3,500 SF of office space on the ground floor. The four-level facility was built was in operating hospital site – extensive coordination was required to mitigate impacts of construction on the adjacent occupied facilities. We assisted the Owner in making critical design decisions based on construction costs. […]

The post Kaiser Vallejo Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Construction of a 241,750 SF parking structure with 3,500 SF of office space on the ground floor. The four-level facility was built was in operating hospital site – extensive coordination was required to mitigate impacts of construction on the adjacent occupied facilities. We assisted the Owner in making critical design decisions based on construction costs. This included establishing a better site on campus to place the 757-stall garage, which helped save costs and allowed for a faster schedule. ³ÉÈËÍ·Ìõ self-performed layout, structural excavation, foundations, slab-on-grade, and vertical concrete placement.

The post Kaiser Vallejo Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
/projects/kaiser-vallejo-parking-structure/feed/ 0
Pleasant Hill Parking Structure /projects/pleasant-hill-parking-structure/ Mon, 24 May 2021 11:05:30 +0000 http://overaa-construction.local/?projects=pleasant-hill-parking-structure Construction of a four-level, 661 stall, post-tensioned parking structure. Scope also covered site improvements (elevator, lighting, and landscaping) plus demolition of the old structure.

The post Pleasant Hill Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Construction of a four-level, 661 stall, post-tensioned parking structure. Scope also covered site improvements (elevator, lighting, and landscaping) plus demolition of the old structure.

The post Pleasant Hill Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Genentech Parking Structures /projects/genentech-parking-structures/ /projects/genentech-parking-structures/#respond Mon, 24 May 2021 11:05:30 +0000 http://overaa-construction.local/?projects=genentech-parking-structures Design and construction of two cast-in-place parking structures to accommodate biotech’s South San Francisco campus growth. Parking Structure I is a 165,000 SF, five-level, 489 stall facility. Parking Structure II is a 199,767 SF , seven-level, 640 stall facility. Combined, ³ÉÈËÍ·Ìõ placed 14,900 CY of concrete on the projects.

The post Genentech Parking Structures appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Design and construction of two cast-in-place parking structures to accommodate biotech’s South San Francisco campus growth. Parking Structure I is a 165,000 SF, five-level, 489 stall facility. Parking Structure II is a 199,767 SF , seven-level, 640 stall facility. Combined, ³ÉÈËÍ·Ìõ placed 14,900 CY of concrete on the projects.

The post Genentech Parking Structures appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
/projects/genentech-parking-structures/feed/ 0
BART Walnut Creek Parking Structure /projects/bart-walnut-creek-parking-structure/ /projects/bart-walnut-creek-parking-structure/#respond Mon, 24 May 2021 11:05:30 +0000 http://overaa-construction.local/?projects=bart-walnut-creek-parking-structure Design and construction of a four-level, cast-in-place, post-tensioned concrete parking structure. ³ÉÈËÍ·Ìõ has also completed parking structures at various other BART stations, including Concord, El Cerrito, Fruitvale and Daly City.

The post BART Walnut Creek Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Design and construction of a four-level, cast-in-place, post-tensioned concrete parking structure. ³ÉÈËÍ·Ìõ has also completed parking structures at various other BART stations, including Concord, El Cerrito, Fruitvale and Daly City.

The post BART Walnut Creek Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
/projects/bart-walnut-creek-parking-structure/feed/ 0
Sutter Health Alta Bates Summit Medical Center Parking Structure /projects/sutter-health-alta-bates-summit-medical-center-parking-structure/ /projects/sutter-health-alta-bates-summit-medical-center-parking-structure/#respond Mon, 24 May 2021 11:03:51 +0000 http://overaa-construction.local/?projects=sutter-health-alta-bates-summit-medical-center-parking-structure Design and construction of a 393,000 SF cast-in-place parking structure in a congested urban environment. The seven-level facility was built on an existing on-grade parking lot in the heart of an operating hospital campus. A multi-story hospital was also being built concurrently on-site. Careful coordination with Sutter Health services and adjacent contractors was required. The […]

The post Sutter Health Alta Bates Summit Medical Center Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Design and construction of a 393,000 SF cast-in-place parking structure in a congested urban environment. The seven-level facility was built on an existing on-grade parking lot in the heart of an operating hospital campus. A multi-story hospital was also being built concurrently on-site. Careful coordination with Sutter Health services and adjacent contractors was required. The new structure provides 1,067 parking spaces for staff, patients and visitors. Integrated Project Delivery (IPD) included the Owner, Architect, and Contractor to optimize the preconstruction and construction processes. The project required extensive below grade parking system evaluation, including multiple deep foundations, soil improvement and waterproofing systems. We self-performed the concrete on the project, placing of 25,000 CY of concrete in 8 months. We met 21 sustainable elements in design and construction, as well as recycled 96% of construction waste, exceeding the City of Oakland’s 65% requirement.

The post Sutter Health Alta Bates Summit Medical Center Parking Structure appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
/projects/sutter-health-alta-bates-summit-medical-center-parking-structure/feed/ 0
Roseville Galleria Cliff Deck Parking /projects/cliff-deck-parking-structure-roseville-galleria/ /projects/cliff-deck-parking-structure-roseville-galleria/#respond Mon, 24 May 2021 11:02:09 +0000 http://overaa-construction.local/?projects=cliff-deck-parking-structure-roseville-galleria Design and construction of a 432,290 SF hybrid precast parking structure. The new five-level facility was engineered to accommodate a future sixth-level and includes a bridge connector to the adjacent mall. The 1,382 stall structure features different colored architectural pre-cast concrete panels, as well as architectural wire mesh and green screen systems. ³ÉÈËÍ·Ìõ completed this […]

The post Roseville Galleria Cliff Deck Parking appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Design and construction of a 432,290 SF hybrid precast parking structure. The new five-level facility was engineered to accommodate a future sixth-level and includes a bridge connector to the adjacent mall. The 1,382 stall structure features different colored architectural pre-cast concrete panels, as well as architectural wire mesh and green screen systems. ³ÉÈËÍ·Ìõ completed this project with an extremely accelerated 10-month schedule. We placed 30,000 square feet of elevated concrete deck per week. We self-performed all layout, building foundation work, concrete footings, slab on grade and all miscellaneous forming and concrete works. Scope also included associated accessible parking areas, hardscape and landscape. The adjacent mall remained open and accessible throughout construction.

The post Roseville Galleria Cliff Deck Parking appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
/projects/cliff-deck-parking-structure-roseville-galleria/feed/ 0
Catholic Healthcare West Sequoia Hospital Parking Garage /projects/catholic-healthcare-west-sequoia-hospital-parking-garage/ /projects/catholic-healthcare-west-sequoia-hospital-parking-garage/#respond Mon, 24 May 2021 11:02:09 +0000 http://overaa-construction.local/?projects=catholic-healthcare-west-sequoia-hospital-parking-garage Design and construction of a 231,000 SF cast-in-place garage adjacent to a concurrent hospital expansion. The five-level, 670 stall facility features a compressed pallet of materials and colors for an overall architecture consistent with the existing hospital campus and adjacent residential properties. A combination of perforated precast panels and a stainless steel screen limit light […]

The post Catholic Healthcare West Sequoia Hospital Parking Garage appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
Design and construction of a 231,000 SF cast-in-place garage adjacent to a concurrent hospital expansion. The five-level, 670 stall facility features a compressed pallet of materials and colors for an overall architecture consistent with the existing hospital campus and adjacent residential properties. A combination of perforated precast panels and a stainless steel screen limit light overspill from the facility into the surrounding areas. The low-profile parking structure was designed to be terraced into the sloped site. Extensive coordination and planning measures were required with the multiple adjacent general contractors working on the new hospital expansion and to ensure patient and staff access to the main hospital throughout construction.

The post Catholic Healthcare West Sequoia Hospital Parking Garage appeared first on ³ÉÈËÍ·Ìõ Construction.

]]>
/projects/catholic-healthcare-west-sequoia-hospital-parking-garage/feed/ 0