Two phase project that included demolition of the existing elementary campus and construction of the new elementary school. Phase 1 included the set up of portables for interim housing and demolition of existing campus, plus site utility work during an intense 120 day schedule. Student safety was paramount in the planning and construction of the interim school site. Phase 2 included construction of a new 73,000 SF elementary school and 11 acres of site work including parking, paving, playground equipment, lunch, and recreation areas. New construction featured six buildings: an admin building, three one-story classrooms, a two-story classroom, and a multi-purpose room. The site was located in a busy residential area with limited vehicular access. Sensitivity to neighbor concerns was an priority met with ongoing communication and preventative mitigation measures.

Owner
Mill Valley School District
Location
Mill Valley, CA
Architect
Deams Luis McKinley
Square Feet
73,000